Level 4 - Change IEP from Draft to Active
PrintStep 1: Complete all modules for the IEP. Every module will need to be saved and completed before being able to change status for an IEP.
Step 2: Click on Draft in the drop down menu to display the other options now available and select Make Active.

The IEP will now show a Progress Report module. All other Modules will be locked.

After an IEP is made Active a Level 4 user will have the below options. A Level 4 user is able to revert an active IEP to a draft if necessary. A Level 4 user is also able to Create An Amendment or Create An Annual once an IEP is Active.

